There's No One-Size-Fits-All Answer
I'm not going to give you a single recommendation for emergency Kleemann equipment. That would be lazy. In my role coordinating rush orders for a Swedish aggregates company—what we call Kleemann Sverige—I've handled over 50 emergency deliveries in the past six years. The right machine depends on your timeline, your material, and your site. So let's break it down into three scenarios.
Before we start: my experience is mostly with mid-sized quarries in Sweden. If you're in a different country or working with a massive open-pit mine, your situation might be different. I'll flag where my knowledge gets fuzzy.
Scenario A: The 48-Hour Emergency
This is the call that wakes you up. A primary crusher fails, a contractor needs aggregate by Friday, or a road project is behind schedule. You don't have weeks to wait for a factory order.
Last March, a quarry outside Gothenburg called at 7 AM. Their jaw crusher had seized, and they had 5,000 tons of granite to process for a highway project. Normal lead time for a new unit? 10 weeks. We had a MOBICAT MC 110i EVO2 in our rental fleet, about two hours away. We had it on-site by 4 PM the same day.
The key was mobility. That machine is track-mounted, so it could crawl right up to the feed pile. I'm not a tire engineer, so I can't tell you the exact ground pressure specs. But I know from experience that track units handle mud and snow better than wheeled ones. For an emergency, that matters more than fuel efficiency.
What did it cost? We paid about €2,500 in rush transport and a premium rental rate. The client avoided a €20,000 penalty clause. That was a no-brainer.
My advice for this scenario: rent a track-mounted jaw crusher. The MC 110i EVO2 is a solid choice because it's easy to set up and doesn't need a concrete foundation. Don't get hung up on tire specs—focus on whether the machine can be there tomorrow.
Scenario B: The Month-Long Window
Maybe you have a few weeks before your project starts. You know you need a machine, but you're not sure whether to buy or rent, and which model fits your output. This is where the question "how many yards does Henry have" comes up—not literally about a guy named Henry, but about your required volume.
I once worked with a quarry manager named Nuka Kleemann (true story, no relation to the brand). He asked me how many yards per hour a MOBICONE MCO 9i EVO could produce. I had to correct myself: in Sweden we measure in metric tons, not yards. But the principle is the same—you need to match the crusher's capacity to your haul trucks and screen.
For a month-long window, consider the EVO2 series. They're designed for high throughput and quick relocation. The MCO 9i EVO is a cone crusher that works well for secondary crushing. If you're doing primary crushing, look at the MC 110i EVO2 or the MC 120i PRO.
Here's a mistake I made once: I assumed bigger was always better. We rented a larger machine for a job, but it couldn't fit through the tunnel portal at the site. We ended up wasting two days. So verify your site access before you commit.
Also, think about drift mining operations. If you're in a narrow vein or tunnel, you might need a compact unit. The EVO2 line has smaller models like the MC 100i EVO. But if you're mostly doing surface quarrying, go bigger.
Scenario C: Remote or Extreme Conditions
Swedish winters are brutal. If you're operating north of the Arctic Circle, you need more than just a good crusher. You need to think about tires—or tracks—and how they handle snow, ice, and mud.
We once delivered a MOBISCREEN MS 702i EVO to a site near Kiruna in January. It was -28°C. The machine ran, but we had to add extra heating for the hydraulic system. That's not something Kleemann builds as standard, because it's not their core specialty. They make crushers, not arctic survival gear. We worked with a local upfitter to add the heating.
This is where I'll be honest: if your project is primarily about extreme cold-weather operations, Kleemann might not be the only answer. You might need a specialist in cold-climate modifications. And that's fine. The vendor who says "this isn't our strength—here's who does it better" earns my trust for everything else.
For remote locations, also consider logistics. How will you get spare parts? Do you have a local mechanic who knows Kleemann systems? In my experience, the machines are reliable, but when something breaks, you want support nearby.
How to Determine Your Scenario
Ask yourself three questions:
- How many days until you need to process material? If less than 3 days, you're in Scenario A. If 7-30 days, Scenario B. If more than 30 days, you might just order a new machine and wait.
- What's your site access like? Tight tunnels, muddy ground, or snow? Track-mounted units are safer. Flat, firm ground? Wheeled units are rare in mobile crushing, so tracks are still the norm.
- What's your long-term plan? If you'll need the machine for years, buy. If it's a one-off project, rent. The rental premium is worth it for flexibility.
My experience is based on about 50 rush orders, mostly in Sweden. If you're in a different market, like Germany or the US, your dealer support and lead times might differ. I can't speak to that.
One last thing: don't assume "mobile" means "underpowered." The EVO2 line has impressed me. But no machine is perfect for every job. Know your limits, and know the equipment's limits. That's how you avoid costly mistakes.